Jelly MachineShop floor

Track every job on your shop floor.

See where every job stands right now. Plan the work, buy the parts, build it, and ship it. That live tracker is Jelly Flow.

Demo job · live floor
STAGE
Stage / Pull
1
Tablet 14
Kit · Frames A–C
Demo
Kit · Sash LH/RH
Demo
CUT
Cut / Fab
22
Tablet 153
452TCG011 · Bar #33
Demo
452TCG011 · Bar #32
Demo
ASM
Assembly
11Andon
Tablet 112
U-01 Frame A
Demo
U-02 Frame B
Demo
PACK
Packing
Tablet 16
Crate A
Demo
Crate B
Demo
SHIP
Shipping
Tablet 12
Truck 14 · Dock A
Demo
Truck 22 · Dock B
Demo
Tap the story to see Jelly Flow

Jelly Flow

Walkthrough

Try the interactive demo
Prep · Work units

Break the job into units.

Each opening, sash, and panel becomes a unit you track. Every unit gets a checklist. Sign it off before work hits the floor.

JOB-4504 · Units12 done
U-01 Frame A
U-02 Frame B
U-03 Sash LH×2
U-04 Sash RH

Same unit squares as the Prep · Units canvas.

Bring units in your way

Import from Excel or Logikal. Or we build a custom fit.

Drop in an Excel or XLSX cut list. Pull a Logikal assembly list. Or ask us to build an importer for the system you run now. Units land on the same checklist either way.

Excel / XLSX

Map your columns once. Then bring in openings and counts in one pass.

Logikal

Pull build lists and elevations (wall drawings) right in.

Custom import

We build a connector for your ERP, CAD, or shop spreadsheet.

Prep · Cut Optimize
Optional

Fit more parts on fewer bars.

Pull the parts from the job. Pack them onto stock bars and lock in your yield before you buy. You see each bar, the offcut (the leftover piece), and the waste. Buyers and the floor work from one cut plan.

Cut Optimize
Optional · 3 / 3 confirmed
6063-T5 · 20 ft
94% yield
AABCA·
5 parts nestedConfirmed
6063-T5 · 16 ft
91% yield
BCBD·
4 parts nestedConfirmed
Hardware bar · 12 ft
88% yield
EEFE·
4 parts nestedConfirmed
Prep · Packages

Group units into packages.

Crates hold finished units for the trip. Stack them from the bottom up. The unit on the crate floor gets built first. That way heavy frames go in before light tops.

Packages1 crate
Crate AQR
1
U-03
Frame C
2
U-02
Frame B
3
U-01
Frame A · bottom
Ground
Prep · Batches

Batch work for the floor.

A batch is the chunk of work you send to the floor. Push it when materials are ready. A priority matrix (a build order) sorts the units inside. The shop builds the way crates pack.

Batches2 ready
Batch 1 · Showroom
1
Crate A
3 units
2
Crate B
3 units
Batch 2 · Field install
1
Crate C
4 units
2
Crate D
2 units
Priority matrix

Build for the crate, not the order you typed.

When a batch hits the floor, queues sort by build order. New batches line up behind work already going. Inside a batch, the matrix works crate by crate, from the bottom up.

Batch arrival

The first batch you release stays in front. New ones line up behind it.

Bottom-up level

Level 0 sits on the crate floor. It gets built first, so heavy frames load before light tops.

Crate priority

Two crates on the same level? The batch package order breaks the tie. Every crate fills evenly.

Priority matrixBuild order
Crate AQR
1
U-03
Frame C
2
U-02
Frame B
3
U-01
Frame A
Ground
3rd
2nd
1st

Same crate as Prep · Packages. Build climbs from the Ground up so packs load the way you stacked them.

Prep · Trucks

Load packages onto trucks.

Put each crate on the truck that ships it. Sign off each load. Now dispatch knows what left the dock.

Trucks1 / 2 loaded
Truck 14 · Dock A
1
Crate A
3 units · sealed
2
Crate B
3 units · sealed
Signed off
Truck 22 · Dock B
1
Crate C
4 units
2
Crate D
2 units · loading
Procurement · BOM

Build the bill of materials.

Your BOM (the parts list) rolls up every part and cost. Cut lists and kits from prep fill in draft purchase orders.

Bill of Materials
BOM
48 lines
PartQtyVendor
Extrusion 6063-T5184 ftAluminum Co.
Hardware kit HK-1224 eaFastenPro
Glazing unit GU-412 eaClearView
Sealant S-2008 tubesSealRight
BOM-001Finalized
Job BOM · 48 lines · $18,420
Procurement · PO

Send out purchase orders.

A PO (your order to a vendor) carries your logo, notes, tax, and freight. Email it out and see who wrote back.

Purchase Order
PO
3 issued
PO-0482Issued
Aluminum Co. · 12 lines · $6,240
PO-0483Issued
FastenPro · 8 lines · $1,180
PO-0484Issued
ClearView · 6 lines · $4,920
Procurement · OC

Confirm what vendors will ship.

The OC (the vendor’s promise) checks each line. Late ship dates and short orders show up before they stall the floor.

Order Confirmation
OC
2 / 3
OC-0482Confirmed
Aluminum Co. · 12 lines · $6,240
OC-0483Confirmed
FastenPro · 8 lines · $1,180
OC-0484Draft
ClearView · 6 lines · $4,920
Procurement · BOL

Match what arrives to the order.

The BOL (the paper the driver signs) lines up with your PO lines. A gap flags the job before a station runs short.

Bill of Lading
BOL
Variance
BOL-0211Received
Aluminum Co. · 12 lines · Matched
BOL-0212Receiving
ClearView · 5 lines · Short 1

Quartz delivery short 1 slab — inventory receive blocked until variance clears.

Release to floor

Push batches onto the floor.

Release the batch once prep and buying are clean. It lands on Stage / Pull. The build order rides with it. Operators see the same bottom-up crate order you set in prep.

Release to floorBatches
Batch 1 · Showroom
1
Crate A
3 units · materials ready
2
Crate B
3 units · materials ready
Batch 2 · Field installWaiting
1
Crate C
Awaiting OC on PO-0484
2
Crate D
2 units
Floor · Stage / Pull

Pull materials onto the floor.

Operators work from tablets. Stage / Pull moves each released batch into the live station queue.

Live stationOperator columns = tablets
STAGE
Stage / Pull
1
Tablet 14
Kit · Frames A–C
Hardware + extrusion
Demo Job — ILines 12Loc Rack 2
Kit · Sash LH/RH
Glazing prep
Demo Job — ILines 8
Tablet 23
Kit · Hardware HK-12
Fasteners
Demo Job — ILines 6
Kit · Sealant S-200
Consumables
Demo Job — ILines 4
Operator tabletWhat they see
Stage / Pull
Task 1 of 7In progress
Kit · Frames A–C
Hardware + extrusion · Rack 2
Extrusion 6063-T548 ft
Hardware kit HK-128 ea
Sealant S-2002 tubes
Pause
Done
Completed — cart1
Bar 32 · CuttingSign-off
Waiting on sign-off (2)
Raise an issue
On the tablet

One tablet per operator.

Each column on the station is one live tablet. An operator starts a kit and pulls parts from stock. Then they tap Done. The cart holds the finished pulls until a lead signs off.

  • Start locks the clock so times stay honest
  • Pause / Done are big enough for gloves
  • Raise an issue lights the andon (help light)
Floor · Cut / Fab
Optional

Cut stock into parts.

Cut lists and fab queues sit on the station tablet. Yield, rework, and hand-offs go back to your dashboard as each bar is cut.

Live stationOptionalOperator columns = tablets
CUT
Cut / Fab
22
Tablet 153
452TCG011 · Bar #33
50" · 50" · 50" · 42" · 42" · 42"
Demo Job — IStock 284.88"Cuts 6
452TCG011 · Bar #32
50" · 50" · 42" · 42" · 36"
Demo Job — IStock 240.00"Cuts 5
452TCG012 · Bar #18
72" · 72" · 48"
Demo Job — IStock 192.00"Cuts 3
Tablet 253
452TCG011 · Bar #31
60" · 60" · 48" · 48"
Demo Job — IStock 216.00"Cuts 4
452TCG013 · Bar #07
36" · 36" · 36" · 36"
Demo Job — IStock 144.00"Cuts 4
Operator tabletWhat they see
Operator holding a Jelly Flow tablet at a cut station, showing the Cutting task for bar 452TCG011 with Pause and Done controls
On the tablet

The cut diagram is on the tablet.

Operators see the bar, the cut lengths, the milled ends, and the waste. Then they tap Pause or Done. Finished bars sit in the cart until QC (a quality check) signs them off.

  • Part # and bar index front and center
  • Stock length + cut pattern match the optimizer
  • Cart holds work that needs sign-off
Floor · Assembly

Build units. Sign off QC.

Assembly cells run their own tablet queues. Andon lights flag trouble fast. Finished work waits for your QC sign-off before packing.

Live stationOperator columns = tablets
ASM
Assembly
11Andon
Tablet 112
U-01 Frame A
Kit ready · QC pending
Demo Job — IParts 18Crate A · 1/3
U-02 Frame B
Waiting hardware
Demo Job — IParts 18
Tablet 29
U-03 Sash LH
Glazing prep
Demo Job — IParts 11
U-04 Sash RH
Glazing prep
Demo Job — IParts 11
Operator tabletWhat they see
Assembly
Task 1 of 12In progress
U-01 Frame A
Crate A · slot 1 of 3
Hardware kitSeated
Corner keys4 / 4
Seal checkPending
Pause
Done
Completed — cart1
U-12 Frame C · AssemblySign-off
Waiting on sign-off (1)
Alert sent — a lead has been notified
CriticalMissing hardware kit HK-12
Cancel
On the tablet

Build order, not guesswork.

The tablet follows the priority matrix. It starts at the bottom of each crate. It then moves crate by crate, so packs load the way prep stacked them. Any tablet can raise andon so a lead jumps in.

  • Bottom-up crate slots match how packs load
  • Andon raises issues without leaving the queue
  • Sign-off opens the hand-off to packing
Floor · Packing

Crate finished units.

Packing stations put units into crates. Each crate already knows its truck from prep.

Live stationOperator columns = tablets
PACK
Packing
Tablet 16
Crate A
3 units · foam + wrap
Demo Job — IUnits 3/3Truck 14
Crate B
3 units
Demo Job — IUnits 0/3
Tablet 24
Crate C
4 units
Demo Job — IUnits 0/4
Operator tabletWhat they see
Packing
Task 1 of 6In progress
Crate A
Truck 14 · Dock A
U-01 Frame APacked
U-02 Frame BPacked
U-03 Sash LHIn crate
Pause
Done
Completed — cart2
Bar 32 · CuttingSign-off
Waiting on sign-off (2)
Raise an issue
On the tablet

Pack to the truck plan.

Operators see the crate they are filling. They see which units go in it. They see the truck it ships on. These are the same crates you set up in prep.

  • Crate contents match the prep packages
  • You see the truck before the crate is sealed
  • Done moves the crate toward shipping
Floor · Shipping

Load trucks. Send the BOL.

Open the Shipping tab on the station. Fill out the outbound Bill of Lading and approve the truck to leave. Then track it from your dock to the site.

Station modalShipping tab
Dock / Ship
Shipping
Live viewShippingSettings
Demo Job — Fully Ordered (Ready for Production)Not started
Truck 1
Old Dominion · PRO BOL-1000
Not loaded
0/4
crates
Crate 54 unitsQRPending
Crate 14 unitsQRPending
Crate 24 unitsQRPending
Crate 34 unitsQRPending
Approval unlocks when fully loaded
Approve truck
BOL-00002Prep & checklistPrintCopy link
Truck 2
No carrier set
Not loaded
0/4
crates
Crate 64 unitsQRPending
Crate 74 unitsQRPending
Crate 84 unitsQRPending
Crate 44 unitsQRPending
Approval unlocks when fully loaded
Approve truck
Create BOLPrep & checklist
Truck 3
No carrier set
Not loaded
0/4
crates
Crate 94 unitsQRPending
Crate 104 unitsQRPending
Crate 114 unitsQRPending
Crate 124 unitsQRPending
Approval unlocks when fully loaded
Approve truck
Create BOLPrep & checklist
On the shipping tab

One truck. Every crate. Live BOL.

Mark each crate Loaded. Finish the BOL and add a QR code the driver can scan. Then approve the truck to leave. Status moves from Loading → Awaiting sign-off → In route → Arrived.

  • Crate-by-crate load progress per truck
  • Outbound BOL with print + public tracking link
  • Admins approve each truck on its own
The whole floor

Every station. One connected line.

Same stations as the timeline: Stage → Cut → Assembly → Pack → Ship. The arrows match how work hands off on the live floor. The line ends with the BOL and a truck rolling out.

Demo job · live floor

Click a station to jump back to that step. The dashed arrows match the live canvas.

Field · Receiving

Confirm the truck arrived.

The field crew picks up where Shipping left off. They confirm the truck is here. Then they check each crate against the BOL before anything gets opened.

Live stationOperator columns = tablets
RCV
Receiving
Tablet 12
Truck 14 · Site dock
BOL-0142 · arrived
Demo Job — ICrates 1/2ETA On site
Truck 22
In route
Demo Job — ICrates 0/2
Operator tabletWhat they see
Receiving
Task 1 of 2In progress
Truck 14 · Arrived
BOL-0142 · account crates
Crate AAccounted
Crate BPending
BOLMatched
Pause
Done
Completed — cart2
Bar 32 · CuttingSign-off
Waiting on sign-off (2)
Raise an issue
On the tablet

Manifest to the dock.

The receiving tablet lists the load and every crate on the truck. Crews tap Accounted-for on each one. These are the same crates that left your shop.

  • Arrival confirms the truck is on site
  • Accounted-for clears each crate into Uncrating
  • Shortages flag before install starts
Field · Uncrating

Open crates. Catch road damage.

Crews uncrate (open the crate) and check each unit. They look for damage from the road. This happens before units move to a floor or zone.

Live stationOperator columns = tablets
UNCR
Uncrating
1
Tablet 12
Crate A
3 units · clear
Demo Job — IUnits 2/3
Crate B
Transit check
Demo Job — IUnits 0/2
Operator tabletWhat they see
Uncrating
Task 1 of 2In progress
Crate A
Units inside · damage check
U-01 Frame AClear
U-02 Frame BClear
U-03 Sash LHPending
Pause
Done
Completed — cart1
Bar 32 · CuttingSign-off
Waiting on sign-off (2)
Raise an issue
On the tablet

Crate in. Units out.

Crews open each crate and see the unit list inside. They mark the contents clear. If a unit is damaged, they flag it before install.

  • Unit list matches what was packed at the shop
  • Road damage caught before staging
  • Done hands units to Site Staging / Install
Field · Installation

Set and anchor in place.

Crew tablets show the next unit, its elevation, and where it goes. The queue works just like the shop floor. Start, pause, done, and sign off at the site.

Live stationOperator columns = tablets
INST
Installation
1
Tablet 13
U-01 Frame A
Level 2 · Elev. N
Demo Job — ILoc 2N-01QC Open
U-02 Frame B
Level 2 · Elev. N
Demo Job — ILoc 2N-02
Tablet 22
U-03 Sash LH
Level 1 · Elev. E
Demo Job — ILoc 1E-03
Operator tabletWhat they see
Installation
Task 1 of 5In progress
U-01 Frame A
Level 2 · Elev. N · 2N-01
TagU-01
ElevationNorth
Location2N-01
Pause
Done
Completed — cart2
Bar 32 · CuttingSign-off
Waiting on sign-off (1)
Raise an issue
On the tablet

Unit sheet on the tablet.

Tag, size, elevation, and install notes ride with each unit. Crews work the queue. Leads sign off before punch and final inspection.

  • Each unit keeps its shop ID
  • Location / elevation on every task
  • Sign-off is needed to close out
Field · Punch List

Fix the last items before turnover.

The punch list (the fix-it list) holds every touch-up. Nothing slips past final inspection.

Live stationOperator columns = tablets
PUNCH
Punch List
Andon
Tablet 13
U-02 · Seal touch-up
Level 2 · Elev. N
Demo Job — IPri Med
U-05 · Scratch cover
Level 1 · Elev. W
Demo Job — IPri Low
Operator tabletWhat they see
Punch List
Task 1 of 3In progress
U-02 · Seal touch-up
Deficiency · Level 2
UnitU-02
IssueSeal gap
StatusIn progress
Pause
Done
Completed — cart2
Bar 32 · CuttingSign-off
Waiting on sign-off (2)
Raise an issue
On the tablet

Punch items, not spreadsheets.

Each fix is a task on the crew tablet. Crews close it out. If they get stuck, they raise andon. The punch list stays honest.

  • One task per fix
  • Blocked items raise andon on the site board
  • A clear punch list unlocks Final Inspection
Field · Final Inspection

Walkthrough and sign off.

Check the installed work and close the job. The timeline started with units on your shop floor. It ends with turnover at the site.

Live stationOperator columns = tablets
INSP
Final Inspection
Tablet 12
Level 2 walkthrough
Punch clear · sign-off
Demo Job — IUnits 8/12
Level 1 walkthrough
Pending
Demo Job — IUnits 0/6
Operator tabletWhat they see
Final Inspection
Task 1 of 2In progress
Level 2 walkthrough
Verify install · close site
PunchClear
Units8/12
Sign-offOpen
Pause
Done
Completed — cart2
Bar 32 · CuttingSign-off
Waiting on sign-off (2)
Raise an issue
On the tablet

Turnover on the tablet.

Final inspection walks every installed unit. It checks that punch is clear. Then it signs the site off. You need no other app.

  • Every unit gets checked
  • Punch must be clear to finish
  • Sign-off closes the field run
The whole site

Receive. Install. Sign off.

Field sites pick up each truck that leaves. Receiving through final inspection runs on the same timeline. Crew tablets sit at every station.

Demo job · field site

Click a station to jump to that field step. The arrows match the live field floor.

Ready to try it?

Run the demo yourself. Or tell us about your shop. We'll walk you through the same timeline.

More about Jelly Flow skips the walkthrough. It covers the dashboard, vendors, field sites, and more.

Enterprise

Talk to us about Jelly Flow.

There is no free trial for this one. Tell us about your shop and job sites. Share your volume, the tools you use now, and the steps you need. We'll get back within one business day.

  • We set you up and move your data over.
  • Templates and board actions set up the way you work.
  • A direct line to our team on this same thread.
Prefer email? Reach us through Support.

We email our team right away and log your note so nothing slips.

Common Questions

How Jelly Flow works on your floor and at the job site. Plus tablets, imports, Boards, and websites.

Loading FAQs...